Home > Data Storage Tips > Backup and disaster recovery > Neglecting change control can kill a DR plan
Storage UK Tips:
EMAIL THIS
 TIPS & NEWSLETTERS TOPICS 

BACKUP AND DISASTER RECOVERY

Neglecting change control can kill a DR plan


Pierre Dorion
11.28.2006
Rating: --- (out of 5)


Digg This!    StumbleUpon Toolbar StumbleUpon    Bookmark with Delicious Del.icio.us   


What you will learn from this tip: This tip discusses the impact of change control (or lack thereof) on disaster recovery and offers some best practice information.

((Content component not found.)) Does your disaster recovery (DR) plan documentation still refer to recalling 9-track tapes from vault or outline recovery procedures for Windows NT 3.51 server? While most plans are not that far out of date, a majority of IT practitioners involved with disaster recovery planning pause and smile when asked how current their organization's disaster recovery plan is. This is usually followed by an admission that it needs attention. There are many reasons why DR plans become out-of-sync with the production IT infrastructure; below are among the most common.

  • The plan was developed only to meet an audit requirement and is now collecting dust.
  • The plan is not tested or maintained on a regular basis.
  • The plan is maintained on a fixed schedule only (i.e., once a year or after a test).
  • Change control (or change management) does not take disaster recovery into consideration.
  • Absence of a formal change control process.
  • A recent Gartner Inc. survey published in the Disaster Recovery Journal shows that approximately 51% of respondents made changes to the disaster recovery environment on a predetermined maintenance cycle while only 35% relied on the production change management process.

    The absence of change control is, by far, a disaster recovery plan's or disaster recovery environment's worst enemy. In fact, nonexistent or insufficient change management can be the cause of disaster. There are many documented cases of major outages resulting from poorly planned, yet routine software upgrades. Small and midsized businesses (SMB) can be particularly challenged when it comes to change control due to a lack of resources and funding. This often results in more cycles being spent resolving issues rather than preventing them.

    Following is a summary list of change control related items that any size business with IT dependencies should consider with respect to disaster recovery:

  • Implement a change control process if one does not currently exist. It does not have to be elaborate but should not allow any IT changes to proceed without prior review.
  • Ensure change control takes into consideration the disaster recovery environment and/or plan documentation when evaluating the impact of a change. This must be beyond simple questions and include some form of verification.
  • Disaster recovery must be part of the systems development lifecycle and not an afterthought.
  • Disaster recovery planning must become an ongoing process rather than be considered a project with an end.
  • The disaster recovery coordinator (or person responsible for disaster recovery) should take part in the change review process.
  • Do not wait until the next disaster recovery test to update the disaster recovery environment to reflect changes to the production environment.
  • The disaster recovery plan and disaster recovery environment should be considered as critical as the production systems they were designed to cover and should be maintained accordingly.
  • Organizations with a hot-site subscription with a vendor must be reminded that, although a disaster recovery environment does not physically exist until needed, it is their responsibility to keep the vendor informed of any configuration changes to the production environment that might affect the disaster recovery environment. This should not be done only at contract renewal time but before changes are actually made to ensure that any arising technological or contractual issues are addressed during the planning process.

    Just as we test our disaster recovery plans and procedures on a regular basis (technically), it is also advisable to test your change management process. The mere existence of change control does not automatically guarantee efficiency of the process. This can be as simple as conducting a post-change review to make sure every aspect and possible impact of a change were considered prior to its implementation.

    IT organizations wanting to help their change management process reach maturity may elect to follow IT industry best practices and guidelines, such as those outlined in the ITIL framework (IT Infrastructure Library).

    Whether world class or entry level, change control must not only protect your organization from the impact of poorly planned IT changes; it must help keep both the production and disaster recovery IT environments fully synchronized and ensure all associated documentation and procedures are in good maintenance.

    About the author: Pierre Dorion is a certified business continuity professional for Mainland Information Systems Inc.


    Rate this Tip
    To rate tips, you must be a member of SearchStorage.co.UK.
    Register now to start rating these tips. Log in if you are already a member.




    Digg This!    StumbleUpon Toolbar StumbleUpon    Bookmark with Delicious Del.icio.us   


    RELATED CONTENT
    Backup and disaster recovery
    Data backup strategies: Migrating from tape to disk
    Four disaster recovery strategies to consider when using data deduplication
    Moving bottlenecks in the backup path
    8 steps to better data security
    How to back up virtual machines
    Troubleshooting automated tape libraries
    How to choose a Web-based email archiving vendor
    How to develop a VTL data retention strategy
    How to conduct a disaster recovery test
    Outsourcing backup: Get the right service level agreement

    Disaster recovery and planning
    Users say Compellent's SAN data reduction features make DR planning easier
    A good backup horror story can make you a better backup administrator
    Business continuity means more than just securing your data
    Unified NAS storage plugs business continuity leaks for water company
    Only one way to know how restores will perform: Complete them
    VMware ships Site Recovery Manager DR software
    SunGard plans cloud-based disaster recovery for VMware
    Users face buy-in challenge with disaster recovery
    Archiving can complicate backups if you're not careful
    Almost a third of businesses unprepared for disaster

    RELATED GLOSSARY TERMS
    Terms from Whatis.com − the technology online dictionary
    BS 25999  (SearchStorageUK.com)

    RELATED RESOURCES
    2020software.com, trial software downloads for accounting software, ERP software, CRM software and business software systems
    Search Bitpipe.com for the latest white papers and business webcasts
    Whatis.com, the online computer dictionary

    DISCLAIMER: Our Tips Exchange is a forum for you to share technical advice and expertise with your peers and to learn from other enterprise IT professionals. TechTarget provides the infrastructure to facilitate this sharing of information. However, we cannot guarantee the accuracy or validity of the material submitted. You agree that your use of the Ask The Expert services and your reliance on any questions, answers, information or other materials received through this Web site is at your own risk.

    About Us  |  Contact Us  |  For Advertisers  |  For Business Partners  |  Site Index  |  RSS
    SEARCH 
    TechTarget provides enterprise IT professionals with the information they need to perform their jobs - from developing strategy, to making cost-effective IT purchase decisions and managing their organizations' IT projects - with its network of technology-specific Web sites, events and magazines.

    TechTarget Corporate Web Site  |  Media Kits  |  Reprints  |  Site Map




    All Rights Reserved, Copyright 2008, TechTarget | Read our Privacy Policy
      TechTarget - The IT Media ROI Experts